Sump Pump Installation
+1.20 High Alarm Level +0.40 Low Level Stop Drainage Pump +0.60 1st High Level Start Pump No. 1 +1.00 2nd High Level Start Pump No. 2 +1.50 2nd High Level Start Pump No. 2 +0.50 Low Level Stop +1.70 High Alarm Level Sewage Pump +1.00 1st High Level Start Pump No. 1 Guide Rail (stainless Steel) With Lifting Hook Manhole Cover 0.60×0.60m. (heavy Duty) Mercury Level Sensor Gate Valve (typ.) +0.00 Bottom Of Tank Ground Level Check Valve (typ.) Section Flexible Connection To Wastewater Treatment
[wpfilebase tag=file id=11211 /]
Sump Pump Installation
Draftman
Share post:
Sump Pump Installation
+1.20 High Alarm Level
+0.40 Low Level Stop
Drainage Pump
+0.60 1st High Level Start Pump No. 1
+1.00 2nd High Level Start Pump No. 2
+1.50 2nd High Level Start Pump No. 2
+0.50 Low Level Stop
+1.70 High Alarm Level
Sewage Pump
+1.00 1st High Level Start Pump No. 1
Guide Rail (stainless Steel)
With Lifting Hook
Manhole Cover 0.60×0.60m. (heavy Duty)
Mercury Level Sensor
Gate Valve (typ.)
+0.00 Bottom Of Tank
Ground Level
Check Valve (typ.)
Section
Flexible Connection
To Wastewater Treatment
[wpfilebase tag=file id=11211 /]
Share this:
Related